The Kayseean The Kayseean
The Voice of the Students at King University for over 90 years.

Explore:

  • HOME
  • Inside King Life
    • Campus Life
    • Student Life
    • Faculty
    • Arts & Culture
    • Events
  • Voices
    • Perspective
    • Student Voices
    • Faculty & Staff Voices
    • Alumni Voices
  • Pathways & Purpose
    • Career
    • Purpose
    • Growth
    • Faith
  • King Now
    • News
    • Sports
    • Campus

Trending Posts

  • New Attraction to King’s Athletic Department
    • 1.5K
  • The Man Behind the Press 
    • 1.1K
  • Staff Picks: Valentine’s Day Book & Movie Recommendations 
    • 1.1K
  • President Whitaker Bids Farewell to King University 
    • 1.1K
  • Convocation With Pete Ward 
    • 945

Get Involved

  • Join Us
  • About Us
  • Contact
  • Submit
  • Subscribe
  • King University Website
  • King University Bookstore
  • King Univ. Athletics Website
  • Privacy Policy
The Kayseean The Kayseean

The Voice of the Students at King University for over 90 years.

Subscribe
The Kayseean The Kayseean
  • HOME
  • Inside King Life
    • Campus Life
    • Student Life
    • Faculty
    • Arts & Culture
    • Events
  • Voices
    • Perspective
    • Student Voices
    • Faculty & Staff Voices
    • Alumni Voices
  • Pathways & Purpose
    • Career
    • Faith
    • Growth
    • Purpose
  • King Now
    • News
    • Sports
    • Campus
Oval Construction
  • Campus Life
  • News
  • Republished

Don’t Trip: Oval Construction Underway

  • September 28, 2015
  • 2 minute read
  • 151 views
  • The Kayseean
Share
Share
Share

*Republished from the September 2015 issue of The Kayseean

By Hope Ragan

Construction on the Oval is obvious to everyone on the Bristol campus. Returning students and teachers alike struggle to navigate from one building to another around the Oval, while freshmen can only imagine how much easier it will be to get from the dining hall to the chapel or to the library, or to the fine arts building. Twenty years ago, Thomas Larson, director of Business Operations, was given the task of fixing up the Oval. Until now, he hadn’t had enough money in the budget to do anything but temporary solutions. However, with a budget of half a million dollars this year, repairs are underway. As he walked around the construction site, caking his boots in reddish clay, Larson commented on the construction. “We’re fixing drainage. We’re fixing the entrances to [four] buildings in addition to putting together a better Oval.” 

Oval Construction
BurWill installs new drainage system along with rebricking the oval entirely. Image Credit: Rachel Burrus

Larson said BurWil Construction Company, the contractor for this project, plans to install French drains around the Oval to facilitate efficient draining. BurWil was contracted previously to build Nicewonder Hall. 

Also, according to Larson, sidewalks have been dug up and redesigned. The previous way Oval bricks were laid had mortar connecting each brick. The new design, called basket-weave, presses each brick against the other, eliminating the need for mortar. Larson explained the change may seem minor, yet the new design improves the safety factor. Previously, when it rained, water seeped between the bricks. Freezing temperatures caused bricks to pop up or out, sometimes to the point where bricks would look like they were sitting on top of the sidewalk. In addition to the new design, two extra feet are being added to the width of the sidewalks. This is to make it easier for student foot traffic and to facilitate campus maintenance vehicles that need to access buildings circling the Oval. Also, concrete curbs are being added to the sides of the sidewalk to help keep bricks from sliding loose. Larson said they will also help the sidewalk to help keep bricks from sliding loose. Larson said they will also help the sidewalk last longer. 

In the meantime, temporary fencing around trees and shrubbery are what passersby notice now. Larson explained, “We’re going to save everything we can. If we had not put those fences up we would have trampled the ground around those roots.” Larson said any trees or bushes damaged in the process will be replaced. 

“One of the improvements we’re making is there used to be steps here leading to the Chapel and now there is going to be a ramp,” Larson said, “Any time we do [construction] work we try to improve accessibility wherever we can.” Finally, another amenity includes new lights around the Oval. In closing, Larson emphasized that students not enter the construction site without express permission and a chaperone.” Especially do not wander the site after dark,” he said. “There are lots of hazards on the site at this time.” 

Share
Share
Share
Related Topics
  • Campus News
  • Construction
  • News
  • Oval
  • Republished
Previous Article
  • Career
  • Growth
  • Republished
  • Student Life

Erin Almond Shares Her Passion for Youth Ministry

  • September 28, 2015
  • The Kayseean
View Post
Next Article
  • Arts & Culture
  • Events
  • Faculty & Staff Voices
  • Republished

Slaughter Talks Process Behind Twin City Radio Theatre’s Productions

  • February 20, 2016
  • The Kayseean
View Post

You May Also Like

View Post
  • Alumni Voices
  • Campus Life
  • Faculty
  • News
  • Student Voices

Tribute to Dr. Don Michael Hudson

View Post
  • Campus Life
  • News
  • Republished

King And Sullins To Present “The Messiah”

View Post
  • Campus Life

A New Spooky Event For The City of Bristol 

View Post
  • Campus Life
  • Faith
  • Growth
  • Student Voices

The (Unofficial) Guide to Trusting the Process 

View Post
  • Campus Life
  • News
  • Sports

New Attraction to King’s Athletic Department

Square News Bites
View Post
  • Campus Life
  • News

News Bites: October 3, 2023 

TOP POSTS

  • 1
    • Campus Life
    • Faculty & Staff Voices
    • Growth
    Staff Profile: Michael Tomczak – Student Engagement Librarian
    • 876
  • 2
    • Campus
    • Campus Life
    • Student Life
    Academic Advising 2024 
    • 858
  • Dr. Jennifer Mongold Headshot 3
    • Faculty
    • Republished
    16 King Professors Pursue Ph.D. Degrees While Teaching
    • 228
  • the podcast demo image 4
    • podcast
    Episode 0: The Demo
    • 142
about
The Voice of the Students at King University for Over 90 Years.

EXPLORE:

  • HOME
  • Inside King Life
    • Campus Life
    • Student Life
    • Faculty
    • Arts & Culture
    • Events
  • Voices
    • Perspective
    • Student Voices
    • Faculty & Staff Voices
    • Alumni Voices
  • Pathways & Purpose
    • Career
    • Purpose
    • Growth
    • Faith
  • King Now
    • News
    • Sports
    • Campus

ABOUT:

  • About Us
  • Contact
  • Join Us
  • Archives
  • Submit
  • King University Website
  • Privacy Policy

Subscribe

Receive a newsletter of our favorite articles in your email.

© The Kayseean. All Rights Reserved. | King University

Input your search keywords and press Enter.