The Kayseean The Kayseean
The Voice of the Students at King University for over 90 years.

Explore:

  • HOME
  • Inside King Life
    • Campus Life
    • Student Life
    • Faculty
    • Arts & Culture
    • Events
  • Voices
    • Perspective
    • Student Voices
    • Faculty & Staff Voices
    • Alumni Voices
  • Pathways & Purpose
    • Career
    • Purpose
    • Growth
    • Faith
  • King Now
    • News
    • Sports
    • Campus

Trending Posts

  • New Attraction to King’s Athletic Department
    • 1.5K
  • The Man Behind the Press 
    • 1.1K
  • Staff Picks: Valentine’s Day Book & Movie Recommendations 
    • 1.1K
  • President Whitaker Bids Farewell to King University 
    • 1.1K
  • Convocation With Pete Ward 
    • 943

Get Involved

  • Join Us
  • About Us
  • Contact
  • Submit
  • Subscribe
  • King University Website
  • King University Bookstore
  • King Univ. Athletics Website
  • Privacy Policy
The Kayseean The Kayseean

The Voice of the Students at King University for over 90 years.

Subscribe
The Kayseean The Kayseean
  • HOME
  • Inside King Life
    • Campus Life
    • Student Life
    • Faculty
    • Arts & Culture
    • Events
  • Voices
    • Perspective
    • Student Voices
    • Faculty & Staff Voices
    • Alumni Voices
  • Pathways & Purpose
    • Career
    • Faith
    • Growth
    • Purpose
  • King Now
    • News
    • Sports
    • Campus
Computer Lab in the E. W. King Library
  • Campus Life
  • News
  • Republished

Renovation Team Brings Library into 21st Century

  • September 28, 2015
  • 3 minute read
  • 241 views
  • The Kayseean
Share
Share
Share

*Republished from the September 2015 issue of The Kayseean

By Alex T. Douthat

 King University is pulsing with new life as renovations envelop the main campus. Even the E. W. King library has received a much-needed facelift, the planning and renovation of which took approximately one year and required the teamwork and cooperation of the library and facilities staff. 

 According to Erika Brammer, the Dean of Library Services, planning for the renovations began in September of 2014. The team began by visiting other collegiate libraries that had been recently renovated and from there hired a library space consultant. This consultant then spent three days in the library watching and observing how students and staff interacted with the library. The next step in the process was the hiring of Ken Ross architects as the interior designer. The renovation team clearly desired a great deal of input, but the professionals weren’t the only ones who got a say in the final look of the library. Students were surveyed during this process to ensure that ideas and changes such as the Food for Thought stand would be desirable and well received by the student population. 

 Physical labor also played a key role in the early stages of the renovations. During this time the library staff began tirelessly weeding through old periodicals and materials. Selected materials were moved to storage in the attic of the library building. These materials were strategically maneuvered to the attic space via a dumbwaiter that reaches from the first floor to the third. This process had to be completed long before the actual renovations could begin.

Once the development stage was complete the real heavy lifting began. Tile was removed, shelving known as “stacks” in library lingo were moved, carpet was installed, and a new ADA accessible unisex bathroom was installed on the first floor. Heavy lifting and construction work was performed by King’s facilities staff and led by Tom Larson the project manager. Special dollies were rented and used to pick up and move fully loaded bookshelves around the library. When the facilities staff completed the heavy lifting and the bookshelves had been moved to their newly assigned positions the library staff had to move the books to stay true to the organizational system. The library crew moved 30,000 books in just two days using a train of labeled carts. Previously, several computers were available to student users. 

The new computer lab in the newly renovated E. W. King Library.
The computer lab in the newly renovated E. W. King Library. Image Credit: Rachel Burrus.

However, the number of computers in the new lab are more than double in the past. The end result of all this effort is a library that is beautiful, functional, and user-friendly. “We’re thrilled that we brought the physical building up to our professional reputation,” says Brammer. While highlighting the beauty of the existing windows was a priority the main goal of the library staff was to make the library more user-friendly. Updates such as the new circulation desk in the lobby and more open space on the main floor were all geared towards making the library easier and more useful for students. The renovation teams’ hard work and vision have brought the library into the 21st century and has given students a more functional study environment.

Share
Share
Share
Related Topics
  • Bristol Campus
  • E. W. King Library
  • Rennovation
  • Republished
Previous Article
26, 2015 to listen to Dr. Wolterstorff deliver the opening convocation address.
  • Arts & Culture
  • Events
  • Republished

Dr. Wolterstorff Delivers Opening Convocation Address On Collegiate Education

  • September 15, 2015
  • The Kayseean
View Post
Next Article
  • Career
  • Growth
  • Republished
  • Student Life

Erin Almond Shares Her Passion for Youth Ministry

  • September 28, 2015
  • The Kayseean
View Post

You May Also Like

View Post
  • Alumni Voices
  • Campus Life
  • Faculty
  • News
  • Student Voices

Tribute to Dr. Don Michael Hudson

View Post
  • Campus Life
  • News
  • Republished

King And Sullins To Present “The Messiah”

View Post
  • Campus Life

A New Spooky Event For The City of Bristol 

View Post
  • Campus Life
  • Faith
  • Growth
  • Student Voices

The (Unofficial) Guide to Trusting the Process 

View Post
  • Campus Life
  • News
  • Sports

New Attraction to King’s Athletic Department

Square News Bites
View Post
  • Campus Life
  • News

News Bites: October 3, 2023 

TOP POSTS

  • 1
    • Campus Life
    • Faculty & Staff Voices
    • Growth
    Staff Profile: Michael Tomczak – Student Engagement Librarian
    • 876
  • 2
    • Campus
    • Campus Life
    • Student Life
    Academic Advising 2024 
    • 856
  • Dr. Jennifer Mongold Headshot 3
    • Faculty
    • Republished
    16 King Professors Pursue Ph.D. Degrees While Teaching
    • 228
  • the podcast demo image 4
    • podcast
    Episode 0: The Demo
    • 142
about
The Voice of the Students at King University for Over 90 Years.

EXPLORE:

  • HOME
  • Inside King Life
    • Campus Life
    • Student Life
    • Faculty
    • Arts & Culture
    • Events
  • Voices
    • Perspective
    • Student Voices
    • Faculty & Staff Voices
    • Alumni Voices
  • Pathways & Purpose
    • Career
    • Purpose
    • Growth
    • Faith
  • King Now
    • News
    • Sports
    • Campus

ABOUT:

  • About Us
  • Contact
  • Join Us
  • Archives
  • Submit
  • King University Website
  • Privacy Policy

Subscribe

Receive a newsletter of our favorite articles in your email.

© The Kayseean. All Rights Reserved. | King University

Input your search keywords and press Enter.